Information
Type: Deliberation
Department: PW - Public Works
Directors' Update: April 16, 2025
Business Meeting: April 22, 2025
Summary:The Carr Road Slide Repair project, which is funded by the FEMA Public Assistance Program, requires additional right of way for repair of the road. The project will require additional right of way from one property owner. This resolution instructs the County Engineer to acquire the necessary right of way from one property owner along Carr Road for the project.
Publications:
Cover Letter To:
Additional Copies To: Tina Correia, Robin Saline
Resolution
THE PROPOSED ACQUISITION OF ADDITIONAL RIGHT OF WAY FOR CARR ROAD AT MP 0.26 TO MP 0.28
WHEREAS, repair of Carr Road is needed at MP 0.26 to MP 0.28 due to a slide; and
WHEREAS, the proposed work will require fee acquisition and a temporary easement from an adjoining owner; and
WHEREAS, this project is priority number 4 within the adopted and amended 2024-2029 Six-Year Transportation Improvement Program; and
WHEREAS, this project is a necessary improvement and will benefit the public; and
WHEREAS, this resolution instructs the County Engineer to acquire additional right of way as shown on the attached Exhibit from one property owner along Carr Road.
NOW THEREFORE BE IT RESOLVED that the County Engineer is instructed to acquire all right of way necessary for the repair of Carr Road in Section 15, Township 12N, Range 8 East W.M., and directs that the acquisition shall be in accordance with adopted procedures per Resolution 20-149.
DONE IN OPEN SESSION this 22nd day of April, 2025.