Summary:

The Pigeon Springs Slide Repair project, that is funded by the FEMA Public Assistance Program, requires additional right of way for realignment of the road.  The project will require additional right of way from one property owner.  This resolution instructs the County Engineer to acquire the necessary right of way from one property owner along Pigeon Springs Road for the project.  The acquisition shall be in accordance with adopted procedures per Resolution 20-149. 

Publications:

Cover Letter To:

Additional Copies To: Tim Fife, Tina Hemphill,

Resolution

Wording/In the matter of:

THE PROPOSED ACQUISITION OF ADDITIONAL RIGHT OF WAY FOR PIGEON SPRINGS ROAD MILEPOST 2.295

Resolution Number: 22-307

WHEREAS, realignment of Pigeon Springs Road is necessary due to a recent landslide; and

WHEREAS, the realignment of the road will require additional right of way from one adjacent property owner; and

WHEREAS, this project is a necessary improvement and will benefit the public; and

WHEREAS, this resolution instructs the County Engineer to acquire additional road right of way, as shown on the attached Exhibit, from one property owner along Pigeon Springs Road for the project.

NOW THEREFORE BE IT RESOLVED that the County Engineer is instructed to acquire all necessary right of way and is authorized to sign documents necessary for the realignment of Pigeon Springs Road in Section 6, Township 13 North, Range 2 East, W.M., and directs that the acquisition be in accordance with adopted procedures as per Resolution 20-149.