Directors' Update: March 27, 2024
Business Meeting: April 2, 2024
Summary:The Carr Road Slide Repair project, that is funded by the FEMA Public Assistance Program, requires additional right of way for repair of the road. The project will require additional right of way from one property owner. This resolution instructs the County Engineer to acquire the necessary right of way from one property owner along Carr Road for the project.
Publications:
Cover Letter To:
Additional Copies To: Tina Hemphill, Robin Saline
Resolution
THE PROPOSED ACQUISITION OF ADDITIONAL RIGHT OF WAY FOR CARR ROAD AT MP 0.20
WHEREAS, repair of Carr Road is needed at MP 0.20 due to a slide; and
WHEREAS, the proposed work will require one fee acquisition from an adjoining owner; and
WHEREAS, this project is priority number 4 within the adopted and amended 2024-2029 Six-Year Transportation Improvement Program; and
WHEREAS, this project is a necessary improvement and will benefit the public; and
WHEREAS, this resolution instructs the County Engineer to acquire additional right of way as shown on the attached Exhibit from one property owner along Carr Road.
NOW THEREFORE BE IT RESOLVED that the County Engineer is instructed to acquire all right of way necessary for the repair of Carr Road in Section 15, Township 12N, Range 8 East W.M., and directs that the acquisition shall be in accordance with adopted procedures per Resolution 20-149.
DONE IN OPEN SESSION this 2nd day of April, 2024.